Flood-blocked Diktel-Chakhewa Bhanjyang road comes into operation

The Diktel-Chakhewa Bhanjyang road, which had been obstructed by floods, has been restored to operation. The road connecting Diktel Rupakot Majhuwagadhi Municipality-8 Bubalung Pankhukhola was rendered impassable due to severe flooding. 

Following heavy rains on June 5, the Diktel-Chakhewa Bhanjyang road along the Mid-Hill Highway was obstructed. 

With the reopening of the flood-affected road in Pankhukhola, vehicles traveling to and from Bhojpur to Kathmandu via Diktel are now operational.