Gamgadhi-Balai-Pina road obstructed for two months

Vehicular movement along the Gamgadhi-Balai-Pina roadway has come to a complete halt due to landslides and floods triggered by the rainfall for two months.

It has resulted in sheer inconvenience to the transportation and people's mobility.

Locals are compelled to use a long alternative route, carrying food grains and fetching medicines.

Local Dan Bahadur Shahi mentioned, "Landslides have occurred in most of the places along the roadway. No one has paid attention to resume the blocked road. Locals have been facing problems even in their daily mobility."

However, acting Mayor of Chhayanath Rara municipality, Aishwarya Malla, informed that the debris would be removed once the rainfall stops.