Two-way traffic along the Narayangarh-Muglin road section has resumed.
According to the Area Police Office, Muglin, two-way traffic was disrupted this morning after a landslide occurred at Ichhakamana-5, bridge number three.
The traffic movement has resumed after landslide debris were removed from the road, Chief of Area Police Office, Muglin Police Inspector Bishal Tamang said.
The driver of a truck (Na 6 Kha 710) was also injured in a landslide this morning. Injured driver is undergoing treatment at Muglin Highway Hospital, police said.
Earlier, the road that was closed since Saturday night had resumed on Sunday evening after 18 hours.